Commissioning
Principles
DANGER
Protection Relay Testing
Protection relays are tested prior to commissioning. The twofold goal of these tests
is to maximize availability and minimize the risk of commissioning a malfunctioning
assembly. Since the relay under test is always the main link in the protection chain,
defining the consistency of the appropriate tests is an ongoing challenge.
Since performance is not perfectly reproducable, protection relays based on
electromechanical and static technologies are systematically submitted to detailed
testing for three reasons:
b to qualify relay commissioning
b to check that they actually are in good operating order
b to maintain the required level of performance
The Sepam™ concept makes it possible to do away with such testing, since
the use of digital technology guarantees the reproducibility of the
performances announced.
Each Sepam™ function undergoes full factory qualification. An internal self-testing
system provides continuous information on the state of the electronic components
and the integrity of the functions.
For example, automatic tests diagnose the level of component polarization voltages,
the continuity of the analog value acquisition chain, non-alteration of RAM memory,
and any absence of settings outside the tolerance range. This guarantees a high
level of availability
Sepam™ is ready to operate without requiring any additional qualification
testing that concerns it directly.
Sepam™ Commissioning Tests
Preliminary Sepam™ commissioning tests involve checks, such as:
b checking for compliance with Bills of Material (BOMs), hardware installation
diagrams, and rules during a preliminary general check
b checking for compliance with the general settings and protection settings
entered with the setting sheets
b checking current or voltage input connections by secondary injection tests
b checking logic input and output connections by simulation of input data and
forcing of output status
b validating the complete protection chain (possible customized logical functions
included)
b checking the connection of the optional MET148-2, MSA141 and MSC025
modules
The various checks are described on the next page.
HAZARD OF ELECTRIC SHOCK, EXPLOSION,
OR ARC FLASH
b Only qualified electrical workers should
install this equipment. Such work should be
performed only after reading this entire set
of instructions.
b NEVER work alone.
b Obey all existing safety instructions when
commissioning and maintaining high-
voltage equipment.
b Beware of potential hazards and wear
personal protective equipment.
Failure to follow these instructions will result
in death or serious injury.